Articles

Articles

0

Resurja is currently responsible for treating all the waste produced in the province’s 97 municipalities. The “Jaén-Sierra Sur” Plant receives the waste collected in...

0

A reception pit of 5,000 cubic metres, from where the waste is fed into the process line, 5 treatment lines, each with the capacity...

0

  When, just over five years ago I faced the challenge of launching a new project to bring out two technical magazine, I never imagined...

0

    This scenario makes it necessary to have the Llobregat WRP operating at 100% capacity. The facility was originally built to increase the flows circulating...

0

Ras Abu Fontas 3 has a capacity of 164,000 m3 per day. The final client for the water produced at the plant is the...

0

Macclesfield-based Tidy Planet has partnered with Spanish energy generation specialists SUGIMAT to become the UK’s exclusive distributor of their industry-leading boilers. With 40 years’ experience,...

0

The project entrusted to Bianna Recycling encompassed engineering, manufacture, assembly, commissioning, staff training in operating and maintenance, and plant maintenance. The facility will serve...

0

In December 2017, Untha Iberica Mexico installed two 4-shaft RS40 shredders for the treatment of steel shavings from production waste. In the same month, the company...

0

Proposed solution A water supply pipeline of 1200 in diameter carries water from the Águilas Desalination Plant. This line runs along the right bank of...

0

  The objective of the LIFE ANSWER project (Advanced nutrient solutions with electrochemical recovery) is to demonstrate an integrated solution for water reuse, and the...