Installation of catalytic system at Sant Adrià de Besòs Waste-to-Energy Plant
  The automation of the two lines gives each line a capacity of 7.2 t/h for the treatment of part of the packaging fraction. The design objectives of the two automated lines that form part of the Las Dehesas plant are as follows: • Maximum operating flexibility • High degree of automation...
This special is devoted to ballistic separators, balers & compactors for recycling plants. A simple, comprehensive and useful technical guide to the main features of the ballistic separators, balers & compactors offered by leading national and international manufacturers. This guide is presented in the form of a data table...
Technical process On arrival at the plant, the materials undergo an initial pretreatment stage, in which recyclable elements that have been deposited erroneously in the brown container (metals, plastics, glass, etc.) are mechanically separated. For this purpose, the facility is equipped with a bag opener supplied by Industrias LEBLAN. This...
  Cattle manure poses a problem in northern Spain, where there are a large number of livestock farms. The quantity of this manure, also called slurry, is such that slurry tanks on farms are overflowing and manure is applied without control to fertilise crops. Apart from the ill effects of this...
  This special is devoted to ballistic separators, balers & compactors for recycling plants. A simple, comprehensive and useful technical guide to the main features of the ballistic separators, balers & compactors offered by leading national and international manufacturers. This guide is presented in the form of a data table...
Administrative background and project contextualisation In November 2016, Reciclados Ribera del Xúquer commissioned the 2E Facility of the Consorcio Ribera i Valldigna (Ribera i Valldigna Consortium) Municipal Solid Waste Management Plan, which corresponds to Zonal Plan 5V4 of the Autonomous Community of Valencia. Zonal Plan 5V4 serves the Ribera Alta, Ribera...
This special is devoted to ballistic separators, balers & compactors for recycling plants. A simple, comprehensive and useful technical guide to the main features of the ballistic separators, balers & compactors offered by leading national and international manufacturers. This guide is presented in the form of a data table...
This second special is devoted to ballistic separators, balers & compactors for recycling plants. A simple, comprehensive and useful technical guide to the main features of the ballistic separators, balers & compactors offered by leading national and international manufacturers. This guide is presented in the form of a data...
The Sant Adrià de Besòs waste-to-energy (WtE) plant was built and commissioned in 1975, when it was the first facility of its kind in Spain. The plant has been in operation with excellent uptime for 40 years, thanks to the different upgrading work carried out over that period. The...